PROPERTY IMPROVEMENT RECORDS

A lasting record
of what changed.

Stela turns completed property projects into one property-linked record of what was done, who performed the work, what was installed, and the evidence behind it.

California home-hardening pilot · First record free

STELA PROPERTY RECORD ST-2026-000142
RECORD COMPLETE
PROPERTY

4812 Example Road

Placerville, California

Class A roof replacementDOCUMENTED
Ember-resistant ventsDOCUMENTED
Zone 0 hardeningWEAK PROOF
18PHOTOS 3PRODUCTS 1PERMIT 1ATTESTATION
ISSUEDSEP 09 2026 PROPERTY-LINKED RECORDstelarecord.com/r/ST-2026-000142
WHY STELA

The work ends. The record shouldn’t.

A roof replacement or hardening project may matter years after closeout, but its evidence usually lives in phones, inboxes and folders. Stela preserves that work as part of the property’s history so it can still be understood after the crew leaves, the insurer changes, or the property is sold.

THE STELA RECORD

One project.
Built into the property history.

Every Stela Record is tied to a property and project, with a stable record ID, issued revisions, and the evidence needed to understand what changed long after closeout.

EVIDENCE COMPLETENESS4812 Example Road
REV 03
Class A roofE-01–E-08 · invoice · permit · product record
DOCUMENTED
Ember-resistant ventsE-09–E-14 · product record
DOCUMENTED
Zone 0 perimeterE-15–E-18 · north elevation missing
WEAK PROOF
Permit closeoutNo final inspection uploaded
MISSING
Every status points to the evidence, document, product record, or missing item behind it.
01

Evidence indexed

Before, installation and completion photos are tied to the specific improvement they support.

02

Products identified

Manufacturer, model, rating and supporting product documentation stay with the job.

03

Documents preserved

Invoices, permits, inspections and closeout paperwork remain tied to the project instead of disappearing into a folder after closeout.

04

Contractor attested

The contractor confirms that the submitted record accurately describes the work performed.

THE STELA EVIDENCE STANDARD

Not just files.
Evidence that explains itself.

A closeout folder shows what files exist. A Stela Record shows what each file supports—and keeps missing evidence visible.

01

Prove the detail, then the context.

Capture the product or installation detail, then step back and show where it exists on the property.

02

Labels turn claims into facts.

When a rating, model or listing matters, capture the label or supporting specification.

03

Missing proof stays visible.

Documented work, weak evidence and missing evidence remain clearly distinguished.

HOW IT WORKS

From jobsite to property history.

01

Send the job

Forward the photos, invoice, permit and product information you already have.

02

We organize it

Stela structures the evidence by property, improvement, product and document.

03

Close the gaps

If proof is weak or missing, you get a precise checklist before the record is issued.

04

Issue the record

The customer receives a clean PDF and stable Stela record link. Future projects can build on the same property history.

BUILT FOR HOME-HARDENING CONTRACTORS

Finish the job.
Leave a record.

Your crews already create most of the evidence. Stela turns it into a professional project record that stays usable after closeout and can become part of the property’s improvement history.

  • Roofing and reroof projects
  • Ember-resistant vent retrofits
  • Zone 0 and defensible-space work
  • Whole-home hardening projects
Create your first record free
CALIFORNIA PILOT

Send us one completed job.

Don't reorganize it first. Send whatever you normally have at closeout and we’ll turn the first project into a Stela Record free.

No software to install. We’ll contact you directly about the pilot.